Modification of storage silo 3

Fabrication, delivery and installation of steel structure - 7 425 kg and lattice grills and steps - 69.3 sq. m

Fabrication, delivery and installation of embedded parts and covers.

Fabrication, delivery and installation of steel handrails with a height of 1.40 m and  2.00 m.

Delivery and installation of partition walls.

Assembly and installation of 2 blowers and 1 fan.

Assembly and installation of aeration boxes, including installation of the fabric.

Installation of electric hoists.

Assembly and installation of gates, power boxes, valves, plates

 Assembly and installation of airslides, gutters, pouring heads, including network installation.

Assembly and installation of muffler, quick connections, pressure sensors and pressure gauges with shut-off valves.

Assembly and installation of butterfly valve type DN 40 and DN50

Assembly and installation of butterfly valve type DN 80 and DN100

Assembly and installation of a spherical crane  with handle DN 15 to DN 100;

Delivery and installation of steel pipes and pipe parts of different diameters

         Installation of steel arches DN 40 DN 50.

         Installation of compressed air piping system - 6 bar.

         Installation of collectors for pipe systems of aeration boxes.