Zone 2

Fabrication, delivery and installation of 15,116 kg. of steel structures and installation of 69.3 sq.m of lattice grills and steps.

Installation of steel handrails with a height  up to 2.00 meters for  Steel Structure; installation of grills and steps; redler assembly, redler chain assembly, tensioning, centering; Fixing and centering the Redler in working position; Installation and levelling of steel structure , welding of elements of steel structure;

Installation of equipment for bag filters, installation of fans with supports, electric motors, mufflers, chimney after fans, centering of fans and electric motors, leveling and installation of bag filters. Installation of service platforms and catladders to bag filters.

Installation of screw conveyor for transportation of raw  material, chain conveyors and vibrating feeders / production of DI MATTEO /