CONTOUR GLOBAL

  • From 02.2016 Alpine method cleaning of slag from the chamber screens,  reciduct head, and gas shaft of the Steam Generator 670/140
  • From 04.2016 to 29.07.2016 Construction Repair Works on Circulation Cooling System in TPP Contour Global Maritsa East 3.
  • From 05.2017 to 05.10.2027 Repair of Slag-separate system of Unit 3 and Unit 4. Repair of fans /ВВ и ВРГВ/ of Unit 3 and Unit 4. Repair of Exported Air Heater, ducts and gas ducts of Unit4.
  • From 06.2017 to 21.08.2017 Fabrication and delivery of spare parts for repair of boiler equipment / DDS, ESP, CFRC ( combine feeder for raw coal), exported air heater
  • From 07.2017 to 02.10.2017 Planned repair of DPS Unit 1 /10-40 /
  • From 11.2017 Current maintenance of Belt Conveyors, Coal Dept. and Agitators
  • From 04.2018 to 16.04.2019 Fabrication and delivery of spare parts for repair of reciduct head, gas shafts of boilers ЕП 670-140
  • From 07.2018 to 01.10.2018 Spare parts for crashers ІІnd level Coal Production Department.
  • From 02.2019 to 12.03.2019 Fabrication and delivery of spare parts of gas shaft
  • From 04.2019 to 30.07.2019 Repair of Absorber 1&2 and Absorber 3&4
  • From 06.2019 to 28.06.2020 Major Overhaul of DPS of Boiler Steam Generator 670-140/П-62/ of Unit 1 – RIGHT: DPS-50, DPS-60, DPS-70 DPS-80 of Boiler 1
  • From 12.2019 to 10.02.2020 Fabrication and delivery of spare parts – elements of gas shaft housing 30 of Boiler 3
  • From 02.2020 to 27.11.2020 Construction of emergency oil collection systems from an ESP.
  • From 06.2020 Repair of Gas ducts, Air ducts and air heater exported of Unit 2 and Unit 3. Fabrication of bar screens of cooling towers
  • From 06.2020 ESP/Pipe leading to electromagnetic jarring