89 Hadzhi Dimitar Asenov Str., fl. 3, office 3
042/ 966 069
office@technoengineering.bg

Repair of an explosive diverter

  • Production and delivery of steel structure - 5,000 kg
  • Dismantling of thermal insulation in Zones 1 to 4
  • Dismantling of steel structure of Zones 3 to 5
  • Installation of steel structure - 5,000 kg
  • Delivery and installation of thermal insulation of mineral wool and galvanized sheet b-100 mm according to the specification of the attached drawings