NEOCHIM
- From 06.2016 to 08.08.2016 Pipeline replacement in workshop 630 and Turbine Generator Station.
- From 06.2016 to 29.07.2016 Replacement of 6 pcs. Expansion joints diameter 900 of lines 402 and 602 in workshop 630
- From 06.2016 to 18.08.2016 Repair of positions 111А and 111B – boiler utilizers
- From 05.2017 to 26.09.2017 workshop 640. Installation of spare granulators -500
- From 05.2017 to 16.09.2017 УКР 2017 in workshop 630 – technological equipment
- Major overhaul 2018 in workshop 670/675 – technological equipment
- From 06.2018 to 24.09.2018 Replacement of hot gas pipeline - line 602 and 616 in workshop 630
- From 08.2018 Replacement of pumps position Н-35/3 and position Н-36/1 in workshop 630
- From 07.2019 Revision of boilers – utilizers position.111А/B in workshop „Ammonia“.
- From 07.2019 Repair of technological equipment in workshop „Nitric acid“
and workshop „Turbine Generator Station” - Replacement of bottom pipeline unit economizer Э-21 in workshop “Nitric acid“
- Dismantling and installation of stop valve of steam turbine ПП-8.6-39/16/6 in workshop "Turbine generator station”
- Dismantling and installation of diaphragms in workshop “ Steam distribution and water supply” for metrological verification
- Revision of boilers – utilizers position 111А/B in workshop „Ammonia“
- Revision and repair of technological equipment in building 154 /Sodium nitrate/ in workshop "Nitric acid”
- Revision and Repair of technological equipment in workshop " Nitric acid "
- Workshop 630/"Nitric acid” Unit New pneumatic control of isolation gates position HCVS13.3 r HCVS13.4, ПП20191022_1443_305-HCVSA13_3, ПП2019_1444_305-HCVSA13_4
- Revision and Repair of technological equipment in Neutralization station
- Dismantling and installation of plate position 301 for applying anticorrosion coating
- Dismantling and installation of diaphragm for natural gas position F312 in liquid ammonia warehouse.
- Workshop “Nitric Acid”. Replacement of impulse lines position 1Р106 and F111_1
- Repair of acid refrigerators in workshop "Nitric acid 151"
- Revision of drainage of boiler-utilizer position 111B - workshop 608
- "Dismantling and installation of reverse valve to K-47 - workshop 630
- Dismantling and installation of plugs in Unit 9 – workshop 630"
- Restoration of compromised welds and cladding sections on position 111B
- "Dismantling and installation of Diaphragm F107_D - workshop 841