  • From 09.2015 to 17.03.2016 Replacement of GRP pipelines

DN 250, PN 6 oxidising air with stainless steel DN 200,

 PN 6 in the section from the total collector to Absorber 7 and 8  

  • From 02.2016 to 23.02.2017 Repair activities on equipment in Coal production Department and Ash removal system
  • From 03.2016 to 06.04.2016  Medium repair of grinding fans, fuel systems and  gas shafts of Dust Preparing system 1 -1V of Boiler-1
  • From 04.2016 to 18.05.2016 Average repair of grinding fans, fuel systems and gas shafts  of dust preparation system -9А
  • From 04.2016 to 30.05.2016 Medium repair of Dust preparing system -10А
  • From 04.2016 to 12.04.2018 Alpine services for the removal of emergency deficiencies at equipment in FGD Units 1-4
  • From 05.2016 to 27.06.2016 Reconstruction of oxidizing air system and gas ducts raw gas at FGD Units 5-6
  • From 07.2016 to 12.10.2016 Major overhaul of Combined rotor 6V
  • From 07.2016 to 22.08.2016 Major overhaul of Roller sieves (Coal department) 40 „А” and
  • Shredder second level „А”
  • From 07.2016 to 06.10.2016 major overhaul of Roller sieves (Coal Dept.) 220 "А" and Agitator first level "А"
  • From 08.2016 to 03.08.2018 Services related to the carrying out of medium repair works on absorbers 1 and 2 and their adjacent facilities.
  • From 11.2016 to 19.12.2016 Medium Repair grinding fans, Fuel system  and gas shaft of DP System-12 I
  • From 11.2016 to 19.12.2016 Medium Repair of Grinding fan, Fuel System and Gas shaft of  DP System-12 Zh
  • From 03.2017to 27.07.2017Medium Repair of Dust preparing System-10 Zh
  • From 03.2017 to 27.07.2017 Medium Repair of Dust preparing System – 10 I
  • From 03.2017 to27.07.2017 Medium Repair of Dust preparing System-10Е
  • From 07.2017 to 11.09.2017 Medium repair of grinding fans, fuel Systems and gas shafts of dust preparing system-11I
  • From 11.2017to 18.12.2017 Medium Repair of grinding fans, fuel Systems and gas shafts   of Dust Preparing System-12Е
  • From 11.2017to 18.12.2017 Medium repair grinding fans, fuel systems and gas shafts of dust preparing system-12Zh
  • From 02.2018 to 27.04.2018 Delivery and installation of mobile stations for measuring equipment for emissions inlet of FGD-1 and FGD-2 
  • From 02.2018 Medium repair of grinding fans, fuel systems and gas shafts of dust preparing system-2А of Boiler-2
  • From 02.2018 Medium repair of grinding fans, fuel systems and gas shafts of dust preparing system-2B of Boiler-2
  • From 02.2018 Medium repair of grinding fans, fuel systems and gas shafts of Dust Preparing system-2V of Boiler-2
  • From 02.2018 Medium Repair of grinding fans, fuel systems and gas shafts of Dust Preparing System-2G of Boiler-2
  • From 04.2018 Delivery of spare parts for Dust Preparing System and  Air Heater Exporter of boilers Еп 670-140 (П-62)
  • From 04.2018 Medium Repair of grinding fan , fuel system and gas shaft of Dust Preparing System-7А of Boiler-7
  • From 04.2018 Medium Repair of grinding fan, fuel system and gas shaft of Dust Preparing System-7B of Boiler-7
  • From 04.2018 Medium Repair of grinding fan, fuel system and gas shaft -7B of Boiler -7
  • From 04.2018 Medium repair of grinding fan, fuel system and gas shaft  of Dust Preparing System -7G of Boiler -7
  • From 06.2018 Medium Repair of grinding fan, fuel system and gas shaft of Dust Preparing System-10А of Boiler-10”
  • From 06.2018 Medium Repair of grinding fan, fuel system and gas shaft of Dust Preparing System -10B of Boiler-10”
  • From 06.2018 Medium Repair of grinding fan, fuel system and gas shaft of Dust Preparing system -10B of Boiler-10”
  • From 06.2018 Medium Repair of grinding fan, fuel system and gas shaft of Dust Preparing System -10G of Boiler -10” 
  • From 06.2018 Medium Repair of grinding fan, fuel system and gas shaft of Dust Preparing System -10D of  Boiler-10”
  • Medium repair /MR/ of Dust preparing system /DPS/ 1А of Boiler -1
  • MR of DPS 1B of Boiler-1
  • MR of DPS 1B of Boiler -1
  • MR of DPS 1G of Boiler -1
  • Medium Repair of DPS 7А of Boiler-7
  • Medium Repair of DPS 7B of Boiler-7
  • Medium Repair of DPS 7В of Boiler-7
  • Medium Repair of DPS 7G of Boiler-7
  • "Partial Restoring of precipitator reactor- 2 in workshop „Chemical water treatment and Regimes”
  • "Medium Repair of Grinding Fan, Fuel system, Gas shaft of DP System-11B of Boiler 11
  • Medium Repair of Grinding Fan, Fuel system, Gas shaft of DP System 11G of Boiler 11
  • Major overhaul of Grinding Fan and Gas shaft of DP System-10D of Boiler-10
  • Major overhaul of Grinding Fan and Gas shaft of DP System -10Е of Boiler-10
  • From 02.2020 "„Delivery of spare parts for DP System, Аir heater Major overhaul of Grinding Fan and Gas shaft of DP System exporter, hydro slag separation and ESP of boilers type Еп 670-140 (П-62)“ "
  • From 02.2020""Medium repair of DP System-1 А of Boiler-1"
  • From 02.2020"Medium repair of Dust Preparing System-1 B of Boiler -1"
  • From 02.2020"Medium repair of Dust Preparing System -1 В of Boiler-1"
  • From 02.2020" Medium repair of Dust Preparing System -1 G of Boiler-1" 
  • 06.2020"Major overhaul of Dust Preparing System-9Zh of Boiler-9 "
  • 06.2020"Major Overhaul of Dust Preparing System -9 I of Boiler-9 "
  • 07.2020"Medium repair of grinding fan, fuel system and gas shaft of Dust Preparing System - 6B of Boiler-6
  • 08.2020"Replacement of pipeline added water" of Unit 8 next to Bearing Pump Station-3
  • 08.2020"Construction and commissioning of steel vertical cylindrical tank with a volume of 90 м3 for storage of technical syric acid with a concentration 96 % in workshop ХВО
  • 08.2020"Fabrication of Disk ІІ
  • 09.2020"Major Overhaul of Roller sieve 40А and Shredder second level А
  • 09.2020 "Main Оverhaul of Combined Rotor Equipment 6